A commercial roll-up door is ordered to a measurement, and the measurement is the one part of the job nobody can fix later. A curtain built an inch too wide does not squeeze in; a door ordered without enough headroom for the roll does not hang right. The good news: measuring a roll-up opening is a tape, a ladder, and fifteen honest minutes. This page is the working version of the process. For the illustrated walkthrough, keep our How to Measure guide open alongside it, and if anything below does not match your opening, stop and call (470) 802-3203 before ordering — that call is free, and a wrong door is not.
The four measurements, in order
- Finished opening width. Measure the clear opening between the finished jambs, at the floor and again partway up. On older buildings the two numbers can differ; we need the tighter one. This is the width the door is built to — never measure the old door or the outside of the guides.
- Finished opening height. Measure from the finished floor to the underside of the finished header. If a new slab, pad, or threshold is coming, measure to where the floor will be, not where it is today.
- Headroom. Measure from the top of the opening to the ceiling or the first obstruction above it — conduit, sprinkler lines, lights, ductwork. The rolled curtain needs this space, and bigger doors need more of it. This is the measurement buyers forget most.
- Side room. Measure from each side of the opening to the nearest wall or obstruction. The guides have to mount there with room to work.
The checks that save the order
- Jamb material. Block, steel, and timber jambs each take different mounting. Write down what you have on both sides — mixed jambs happen on older buildings.
- Level and plumb. Sight down each jamb and across the header. A noticeably racked opening does not disqualify a roll-up door, but it changes the conversation, and we would rather have it before the door is built.
- Inside obstructions. Racking, shelving, electrical panels, and stored material near the guides or the roll all matter. Photograph the full inside face of the wall, not just the opening.
- Operation clearance. If the door will run on an electric operator, confirm there is room and power where the operator needs to live. A chain hoist needs clear space for the chain to be worked from the floor.
Mistakes we see, so you do not make them
Measuring the existing door instead of the opening. Rounding to the nearest standard size instead of giving us the exact number. Forgetting that a taller stock door can serve a shorter opening in many cases — the extra curtain stays on the roll — while a door ordered too narrow can never be stretched. And ordering before the opening is finished: framing, blockwork, and slab work should be complete and final before the tape comes out.
Sizing FAQs
What if my measurements land between standard sizes?
Send us the exact numbers anyway. Send exact numbers, photos, and the jamb details, and we will tell you whether a standard size serves the opening or whether the size needs a closer look before quoting. Never round on your own and hope.
Who measures if Steel Curtain Doors installs?
For professional installation across metro Atlanta, the measurements get confirmed as part of the job process. For buy-direct pickup at 4110 Tench Road Suite D, Suwanee, GA 30024, the measurements are yours — which is exactly why this page exists.
Should I send photos with my measurements?
Yes, every time: the opening from inside, the opening from outside, both jambs up close, and the space above the header. Photos answer in seconds the questions that otherwise take three phone calls.
Measure twice, order once
Work the four measurements, run the checks, take the photos — then send the whole set through the quote request so the quote is built on your real opening.