Steel CurtainDoorsBuy direct — pick up in Suwanee, GA(470) 802-3203

Contractor Roll-Up Door Pricing

Contractor Roll-Up Door Pricing

Buy 4 or more and ask for project pricing. Send a door schedule for custom sizes, hardware and fulfillment.

Contractors do not need a sales pitch; they need a number they can put in a bid and defend later. This page explains how our contractor pricing is built so your bid and our quote are talking about the same door. Send one opening or a full door schedule — either way, every line comes back matched to a model, an operation type, and a fulfillment method, so there is no quiet substitution between the bid you won and the door that shows up.

How a contractor quote is built

We price off the door schedule, line by line: opening size, model, insulation, operation (push-up, chain hoist, or electric operator), color, and any seal or hood add-ons the spec calls for. The model range is the commercial Janus lineup we carry — Models 650, 1000, 1000i, 2000, 2000i, 2500, and 3100 — matched by duty cycle first and price second, because a door that fails inspection or burns out in a year is the most expensive door on the job no matter what it cost. If a line on your schedule is underspecified for the building's use, we flag it on the quote rather than pricing it blind.

What speeds a quote up

  • The door schedule or, for a single opening, the finished width and height from the How to Measure guide
  • Jamb material and a photo of each opening, when the building already exists
  • Which lines are stock-acceptable and which are color- or model-specific — stock doors are Satin White, and any other color is a special order at roughly 2–3 weeks
  • Fulfillment per line: pickup at our Suwanee shop, or professional installation where the job is inside metro Atlanta

Fulfillment, without the fine print

Professional installation covers metro Atlanta. Jobs outside the install area are buy-direct with pickup at 4110 Tench Road Suite D, Suwanee, GA 30024 — call (470) 802-3203 about delivery options before you build freight into a bid on an assumption. Lead times are quoted per line, not per job: one special-order color on a ten-door schedule should not hold the other nine hostage, and we will tell you how we would split it.

Contractor pricing FAQs

Can you price from plans before the building is up?

Yes, from the door schedule and specs — with the standing warning that finished openings get re-measured before special-order lines are released.

Do you discount for volume?

Quotes are built per schedule, and repeat buyers send schedules regularly because the numbers hold up. Send the schedule and judge the total like-for-like: same models, same operation, same fulfillment.

Will you work with our installer?

On buy-direct jobs, yes — pickup orders go out with the door matched to the schedule line, and we will walk your installer through an opening question by phone.

What do you need to start?

The schedule, the job's city, and your bid deadline. Deadlines go on the quote request so the turnaround is planned, not hoped for.

Put us in the bid

Send the door schedule: Call (470) 802-3203, or submit the schedule and openings through the quote request page.

Call (470) 802-3203